Календарь
«    Ноябрь 2018    »
ПнВтСрЧтПтСбВс
 1234
567891011
12131415161718
19202122232425
2627282930 

Программа "Одиссея Разума" » Проблемы » Пояснения к долгосрочным проблемам

Пояснения к долгосрочным проблемам

Pet Project
Problem No. 1
Division I, II & III

Sep-19-2012
1. If a team member touches (directly or indirectly) a vehicle after the vehicle breaks the plane of the Start Line that attempt will be considered finished at that time. The attempt will be judged accordingly.

Sep-20-2012
2. B6b Size dimensions: The vehicle may change in size after time begins; however, the problem is to create vehicles that travel. Avoiding travel by having a vehicle extend and/or expand is a violation of the Spirit of the Problem.

Oct-02-2012
3. B9: The Pet Animal - This is not allowed to be a human being and it is not allowed to include one or more team members in its design. Team members are allowed to operate and/or activate it but are not allowed to be all or part of the the Pet Animal to be scored in D8

The Email Must Go Through
Problem No. 2
Division I, II, III & IV

Sep-13-2012
1. B9c: Typo - Should read as follows: c. will be placed in the Internet Area by the team. It must be self-contained except for the use of indirect human power and cords necessary for A/C power.

Sep-13-2012
2. C2c: The Delivery Area will be located 8' from the Loading Zone (not the Internet Area).

Sep-13-2012
3. C2d: Each email must travel a minimum of 8' starting from the Loading Zone and traveling across the Internet area until it breaks the plane of the taped Delivery Zone line.

Nov-02-2012
4. B11 - The work of art attachment: The required work of art sent as an attachment must be tangible at all times and while it is being transmitted it must be in the same form it will be in when it is scored for D8. Images, video, audio, and any other component that is transmitted via a storage device will not count as the required work of art sent as an attachment.

Tumble-wood
Problem No. 4
Division I, II, III & IV

Sep-26-2012
1. B10(c): The ramp must have a visible identifier that indicates the center point of the ramp. The entire structure must be above the center of the ramp when released.

Oct-25-2012
2. A. The Problem and B10 Releasing the Structure Down the Ramp: The Structure must be released down the ramp while it is entirely above the mid point of the ramp. The structure must contact the floor surface between the Launch Line and the Score Line. If it then travels across the Score Line it will be eligible for score in D3. It is not allowed to travel beyond the Score Line without first contacting the floor.

Oct-25-2012
3. Spirit of the Problem: The team must release the structure on a team provided ramp at least one time to be eligible to test the structure for weight held score. The structure must travel down the ramp and directly contact the floor without touching anything else. The team may make up to 3 attempts to receive score for the structure crossing the Score Line.шаблоны для dle
 
  Автор: Director   Категория: Проблемы
Информация
Посетители, находящиеся в группе Гости, не могут оставлять комментарии в данной новости.